![DL/T5210.3-2009电力建设施工质量验收及评价规程第3部分:汽轮发电机组(英文版)](https://wfqqreader-1252317822.image.myqcloud.com/cover/812/33688812/b_33688812.jpg)
4.3 General Part of ST Generator Unit
ST generator foundation preparation
Applicable scope:foundation inspection preparation before ST generator proper erection,with the following inspection items:foundation inspection and geometric dimension check,foundation bearing face chipping,erection of internal baffle plate for secondary grouting,foundation bolt inspection.
4.3.1 Foundation inspection and geometric dimension check inspection and acceptance are given in Table 4.3.1.
Table 4.3.1 Foundation Inspection and Geometric Dimension Check
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_77.jpg?sign=1738978123-66AQaEj4RGUNP7ZYu1lssOE4dA4pguBU-0-7fc45f5ac8f17d668bc0486bf4c8d1af)
Table 4.3.1(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_78.jpg?sign=1738978123-WAdcgyXHwi8g9vBP4zD7q3QKJ15Gn7HT-0-708413933599432544c3e92cad4a6dff)
4.3.2 Foundation bearing face chipping inspection and acceptance are given in Table 4.3.2.
Table 4.3.2 Foundation bearing face chipping
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_79.jpg?sign=1738978123-pLzZLArfEIQ0FtIVP97eula7Yk2gWC04-0-6b9ad926cfda8e4a84da783ae22631b8)
4.3.3 Erection of internal baffle plate for secondary grouting inspection and acceptance are given in Table 4.3.3.
Table 4.3.3 Erection of internal baffle plate for secondary grouting
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_80.jpg?sign=1738978123-fHsz05RQ6xpDSY5cy3ZEQPbvkT2jmPMR-0-63d450f1772eea9188c4b90e74f57d4e)
4.3.4 Foundation bolt inspection and acceptance are given in Table 4.3.4.
Table 4.3.4 Foundation bolt inspection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_81.jpg?sign=1738978123-DXHhLb0GP9UB6aayjpU4a5rTVBno7WdZ-0-d3cba07ab6c5f1a3b9cef4ca7f9a41af)
4.3.5 Ordinary iron cushion machining inspection and acceptance are given in Table 4.3.5.
Table 4.3.5 Ordinary iron cushion machining
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_82.jpg?sign=1738978123-9juRWDuJ5uEl8HH3QSz7zbUXfOgZ8Owr-0-d8cfec2f77e80218e524b1e967db22f6)
4.3.6 Iron cushion erection inspection and acceptance are given in Table 4.3.6.
Table 4.3.6 Iron cushion erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_83.jpg?sign=1738978123-wJlk20Qg7W4Z5idOLTyBWtm41h4RSllk-0-9e84ecb64e414c1e49ca50a732ebb65d)
Table 4.3.6(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_84.jpg?sign=1738978123-Z4W5Hs1oavfE3wYyeNMcaNAMd2vmNYav-0-71ea46792f95d553e75b62ce6ae028b5)
4.3.7 Concrete block machining inspection and acceptance are given in Table 4.3.7.
Table 4.3.7 Concrete block machining
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_85.jpg?sign=1738978123-5LObfysmtoFAthj2r1GXCzA7NR46v7Oh-0-e9e097fa8b9cc0257622b4d783e1883e)
4.3.8 Erection of adjustable fixator inspection and acceptance are given in Table 4.3.8.
Table 4.3.8 Erection of adjustable fixator
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_86.jpg?sign=1738978123-mYwit3MQfsU6PuRtziWobHphxeFLJuDt-0-ababf87aae073c7aaf3f1626fdfa73f0)
4.3.9 Erection of sole plate adjusting screw inspection and acceptance are given in Table 4.3.9.
Table 4.3.9 Erection of sole plate adjusting screw
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_87.jpg?sign=1738978123-z0xATyq07Et3975BBOOCmVzoDrjdUEU5-0-4127c5be351a1a50a3a186df9a9edda2)
4.3.10 Sole plate inspection and erection inspection and acceptance are given in Table 4.3.10.
Table 4.3.10 Sole plate inspection and erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_88.jpg?sign=1738978123-w9MEyQ0suznruAhJ8hvAJWh53tVhJ0CP-0-fddddc6382c5153169175d7fb9bbff50)
Table 4.3.10(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_89.jpg?sign=1738978123-KAEfB7JpxRXw09Iw8UY3JrSHQ3umW3EE-0-4ed4cd096698c98ff8257c49821eab87)
4.3.11 Inspection and acceptance before ST generator unit foundation secondary grouting are given in Table 4.3.11.
Table 4.3.11 Inspection before ST generator unit foundation secondary grouting
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_90.jpg?sign=1738978123-bpAw6un6GPk6uGnQEBRK24ekpOBDltam-0-c939476b6855f0e7f91a4141e3122818)
4.3.12 ST generator unit foundation secondary grouting and curing inspection and acceptance are given in Table 4.3.12.
Table 4.3.12 ST Generator unit foundation secondary grouting and curing
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_91.jpg?sign=1738978123-oTfusNfM8dGybzF911ODPdXDar4MI6RT-0-2a995be11acdd6a708fe772ff411996d)
4.3.13 Foundation settlement observation inspection and acceptance are given in Table 4.3.13.
Table 4.3.13 Foundation settlement observation
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_92.jpg?sign=1738978123-zGiirU2Wn3JKyS8EiftD1dYHn5m4Bta9-0-d6f391ecf0fa7c65a11b8b1dc5bc0263)
4.3.14 Bearing pedestal cleaning and inspection and acceptance are given in Table 4.3.14.
Table 4.3.14 Bearing pedestal cleaning and inspection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_93.jpg?sign=1738978123-e7jBRgWdyijIzqRdDJ2KI4A8gW8ZqFIw-0-58c36ef43452dc0c0bf5284ce45d9a50)
Table 4.3.14(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_94.jpg?sign=1738978123-V67xz8619DOdYyjb8kCDdWkL5ETqYdDR-0-257499984895bb5cb7b37459d23673e7)
4.3.15 Bearing pad inspection and acceptance are given in Table 4.3.15.
Table 4.3.15 Brearing pad inspection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_95.jpg?sign=1738978123-Kj3s9TRpvX8II1RbDLeQI3t87gAaHgQW-0-a875775c0d3a248dce11b4aa4f1a1e3e)
Table 4.3.15(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_96.jpg?sign=1738978123-QYqfY37nZS5D2BeItbk2XZD3qkkZ1r6O-0-2d91c5abec42e0bcfe4f4a2be351113f)
4.3.16 Bearing pad block inspection and acceptance are given in Table 4.3.16.
Table 4.3.16 Bearing pad cushion block inspection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_97.jpg?sign=1738978123-cbu0aNEtbKO4Y8cReibN4SXXiDzuTmlw-0-f086133fdff8142b15b741d0cca610b3)
4.3.17 Recheck and acceptance of alloy steel parts are given in Table 4.3.17.
Table 4.3.17 Recheck of alloy steel parts
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_98.jpg?sign=1738978123-nWkG0DpujJO30e0flR3N0B8v0xJoHcMZ-0-67059d56ed3a9075fa11f8adf8293a63)
4.3.18 Auxiliary equipment and machinery foundation preparation inspection and acceptance are given in Table 4.3.18.
Table 4.3.18 Auxiliary equipment and machinery foundation preparation
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_99.jpg?sign=1738978123-HIeh7IU5OlETsLbygS4VqPLmB4Fb9xQI-0-fe6e58ec734a641bc45581cf53a6a9a5)
Table 4.3.18(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_100.jpg?sign=1738978123-V2Ms9EKFIXf4it4q1Q9m2GJNRpTPbL23-0-15e16665a09824f6e60840613f5f64ec)
4.3.19 Inspection and acceptance of iron cushion and foundation bolt erection for auxiliary equipment and machinery are given in Table 4.3.19.
Table 4.3.19 Iron cushion and foundation bolt erection for auxiliary equipment and machinery
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_101.jpg?sign=1738978123-900VRE1XJ4J5MTTSUBWPSpAKnD49WplF-0-b803694b1d6534e7e0225f091a7c346d)
Table 4.3.19(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_102.jpg?sign=1738978123-T9l1gQNAMfyoeAAKVrhTvuJtMgRcRZb1-0-bb3bf70a98059710d321c97ae6f81656)
4.3.20 Auxiliary equipment and machinery secondary grouting inspection and acceptance are given in Table 4.3.20.
Table 4.3.20 Auxiliary equipment and machinery secondary grouting
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_103.jpg?sign=1738978123-WaVBfha4w0BUEMhRORgU7JspOnlhFEV8-0-2ca7d1276946653d546f8e6c799efa0d)
Table 4.3.20(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_104.jpg?sign=1738978123-bWXB6dfLAZbzuSoq2HZPsqcgOQ9rCvot-0-9c559ae46fce2522928e8d9727892fd4)
4.3.21 Auxiliary machinery bearing pedestal erection inspection and acceptance are given in Table 4.3.21.
Table 4.3.21 Auxiliary machinery bearing pedestal erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_105.jpg?sign=1738978123-BeHBu4R1gj6IACFED2qSbdKEoTiFCTtK-0-12c074b90c1682e10017e6ff27dcd60e)
4.3.22 Inspection and acceptance of sliding bearing inspection and erection are given in Table 4.3.22.
Table 4.3.22 Auxiliary machinery sliding bearing inspection and erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_106.jpg?sign=1738978123-naPhDyhlPjyVNf0AaqcabUGUImru0Yfx-0-3bdf7fb1432a803814f6bda34f883822)
Table 4.3.22(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_107.jpg?sign=1738978123-fZJMH5GBuMxvC3jTfa246qPMf6NZVQWm-0-034d72d7ff2b75b61726087fe1b2421e)
4.3.23 Inspection and acceptance of roller bearing inspection and erection inspection are given in Table 4.3.23.
Table 4.3.23 Auxiliary machinery roller bearing inspection and erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_108.jpg?sign=1738978123-Tx7W08x9AUmMYp4CeAQ0B3KMYyzjmkdC-0-864c5160e281502e181a2f041cf024f5)
Table 4.3.23(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_109.jpg?sign=1738978123-s4Pt4AeSr2R7Rbf88t5slVlqjKLetOKR-0-14083d648e7bb3b8d77c7f7ea294a361)
4.3.24 Ordinary horizontal centrifugal pump inspection and acceptance are given in Table 4.3.24.
Table 4.3.24 Ordinary horizontal centrifugal pump inspection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_110.jpg?sign=1738978123-kZ8Dg0NHrWQTyKfMOmzYKyOE8mmLFUXK-0-662c879bc6a47d51d492341ef40338ed)
4.3.25 Ordinary horizontal centrifugal pump erection inspection and acceptance are given in Table 4.3.25.
Table 4.3.25 Ordinary horizontal centrifugal pump erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_111.jpg?sign=1738978123-8xZXvLjcySiGmSTh1BxlNoUtetFX33nv-0-a606a917c8792ec82d6d5e13349c81ac)
Table 4.3.25(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_112.jpg?sign=1738978123-rAcZqnEtWQGNUfafoPdJCt0X32VOmhHG-0-708f901a5cfe2ba19669adffd7908689)
4.3.26 Horizontal centrifugal pump trial run inspection and acceptance are given in Table 4.3.26.
Table 4.3.26 Horizontal centrifugal pump trial run
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_113.jpg?sign=1738978123-0SrcUminqtKQBv3I62SlrMxlHSkOQi4w-0-59c6a20583aebf4c4b799e89ac1da240)
Table 4.3.26(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_114.jpg?sign=1738978123-EXZiFy4qOsNLKEtG9ESVvWqWLns7H3KE-0-e8489e57f318d7fb1535a47f9fd7bd4b)
4.3.27 Ordinary vertical pump inspection and acceptance are given in Table 4.3.27.
Table 4.3.27 Ordinary vertical pump inspection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_115.jpg?sign=1738978123-Bk8rl3PpGli6CHvF3uXzwFGdFP562ntK-0-42779b3f38b6a2d776b1584ff41935f1)
Table 4.3.27(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_116.jpg?sign=1738978123-1pNs1FNb8Pv6w6HpYlm1RrtlMEdTQwDB-0-d2111668175cc4839b78cdd2950e3ebe)
4.3.28 Ordinary vertical pump erection inspection and acceptance are given in Table 4.3.28.
Table 4.3.28 Ordinary vertical pump erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_117.jpg?sign=1738978123-kJ0Jfc7EDHe5WqCSMbWjMBy3iDw54iw7-0-78baefac2b178542be1372bfe8f64b7a)
4.3.29 Ordinary vertical pump trial run inspection and acceptance are given in Table 4.3.29.
Table 4.3.29 Ordinary vertical pump trial run
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_118.jpg?sign=1738978123-QXPOP4zSMtEyd2NFWHS8WJAKE38wm0hU-0-2d836f5395c49198ea4a56746f407a25)
Table 4.3.29(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_119.jpg?sign=1738978123-6Pb2XtYVnAsrS9E48QyL2n2DsMgOcm1Z-0-1a99070095272803f06d5625c8de978e)
4.3.30 Ordinary fan erection inspection and acceptance are given in Table 4.3.30.
Table 4.3.30 Ordinary fan erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_120.jpg?sign=1738978123-58EiVwO91SvOCEdJuKtp6oJbQZo3qhyM-0-be3b31533d05bcfc79cd4a754e4585ef)
4.3.31 Fan trial run inspection and acceptance are given in Table 4.3.31.
Table 4.3.31 Fan trial run
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_121.jpg?sign=1738978123-gaJgKQJV1dy4Etz22FUahVk8xrJW0hcw-0-553d8cad7ba6e6ae6af1a9823ff5e517)
4.3.32 Auxiliary machinery coupling assembly and centering inspection and acceptance are given in Table 4.3.32.
Table 4.3.32 Auxiliary machinery coupling assembly and centering
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_122.jpg?sign=1738978123-Owf2WlgV59xTqTj8uoGsOzYLrrSHHwpv-0-fe4c6ddb0e97958f21d47de78f187ba0)
Table 4.3.32(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_123.jpg?sign=1738978123-R8dNK6OI94XpAIGWmNYuNgLHvDidDehZ-0-86cfaf266a287a4ac6057de98a98b982)
4.3.33 Container type equipment erection inspection and acceptance are given in Table 4.3.33.
Table 4.3.33 Integrated equipment erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_124.jpg?sign=1738978123-KyFwOWryfeOwKnGYMHNyTy1o53GNq8bv-0-103d2936ae2e6d782f1c31b1341042f7)
Table 4.3.33(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_125.jpg?sign=1738978123-fPwwQH9ZUb4OLce786VG3iwzHIMgKKgg-0-c6c647ae96739c672c41192152baf517)
4.3.34 Ordinary heat exchanger inspection and acceptance are given in Table 4.3.34.
Table 4.3.34 Ordinary heat exchanger inspection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_126.jpg?sign=1738978123-nCxE6v3N2NyfjFCknWpfvW0rsBd13zyJ-0-15c0a41a92e33cc195d8db3d73bf6b32)
4.3.35 Ordinary heat exchanger erection inspection and acceptance are given in Table 4.3.35.
Table 4.3.35 Ordinary heat exchanger erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_127.jpg?sign=1738978123-jIOJsOjoNSYTPiI4tIAuMhrXeVbTLOFK-0-7066c44fbfcb052fbe9005f929562c1a)
4.3.36 Ordinary tank erection inspection and acceptance are given in Table 4.3.36.
Table 4.3.36 Ordinary tank erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_128.jpg?sign=1738978123-vouKf2Cf9fTmk8jzWrF8bLcXrEPArVjf-0-c42a1c5e4b40de0c7bd6f9bfe322998e)
Table 4.3.36(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_129.jpg?sign=1738978123-7EbRlA81hqAM5O0DeKL7s6VlusagCbXK-0-0b32d5edc67c04f5fc6c4b0c462400d9)
4.3.37 Inspection and acceptance of metal parts,steel platform,ladder,rail and cover plate fabrication and erection are given in Table 4.3.37.
Table 4.3.37 Metal parts,steel platform,ladder,rail and cover plate fabrication and erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_130.jpg?sign=1738978123-H2VenmdmDj52kh8yN5trRcTRgG1Fps6P-0-8b1716ab7077e485c40f4ccd875a1a17)
Table 4.3.37(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_131.jpg?sign=1738978123-DVhtXRFiykgktUjDvKdf3iPLZM4esL7s-0-ec0b8917df83e3ed44b56091c5eeae9d)
4.3.38 Gear(worm)reducer,increaser inspection and acceptance are given in Table 4.3.38.
Table 4.3.38 Gear(Worm)reducer,increaser inspection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_132.jpg?sign=1738978123-9fgQ0h1asKypSmAmGlz1D2GrIpOfcZ7z-0-e907650d8b389d3fc8e7218014c8108d)
Table 4.3.38(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_133.jpg?sign=1738978123-0KFov6Og4tLCw0T31GnHzm3SLldn8oRI-0-e95585401afacceae5e9bde3a76735fc)
4.3.39 ST generator unit ordinary equipment erection mandatory provision implementation and inspection are given in Table 4.3.39.
Table 4.3.39 Mandatory provision implementation inspection table of( )subsection project
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_134.jpg?sign=1738978123-Kf9XnNznBnCW0gLHsu6iPlN3E2hBohWo-0-2d27349db3095b647f02cddefd7637fd)