4.11 Steam—Water Centralized Sampling,Feedwater,Boiler water Treatment System
4.11.1 Installation of sampling rack.
1 Scope of application:steam-water sampling device.
2 Inspection quantity:check them item by item.
3 Quality standards and inspection methods are as shown in Table 4.11.1.
Table 4.11.1 Installation of sampling rack
![img](https://epubservercos.yuewen.com/0C4D76/18000634808204406/epubprivate/OEBPS/Images/txt004_243.jpg?sign=1739364202-pxu6ZfbSgSJoHC6CATYRfGlNom7pGu2S-0-5e9557a4ddeec9c967c8aaeea0e94259)
4.11.2 Inspection of the compulsory provision implementation of the steam-water centralized sampling,feedwater,boiler water treatment system shall conform to Table 4.11.2.
Table 4.11.2 Inspection table of compulsory provision implementation of the steam—water centralized sampling,feedwater,boiler water treatment system
![img](https://epubservercos.yuewen.com/0C4D76/18000634808204406/epubprivate/OEBPS/Images/txt004_244.jpg?sign=1739364202-vCQ6gzYQ19zr9UOzKDgmoz9TjZVmqQ8o-0-37dbd58b1357c331e70ff5cec16770e4)
Table 4.11.2(Continued)